Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Scope of Project: The Mosley Rd Street Rehabilitation project generally involves a base bid and 3 Alternate bid improvements as follows: Question Deadline 03/21/2024 at 5:00 PM CT Base Bid The Base Bid improvements limits are from Scranton St to Airport Blvd (STA 32+88.74) including the southern portion of Airport Blvd and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Construction of high early strength 11-inch reinforced concrete pavement with lime stabilized subgrade and doweled concrete curbs. Construction of high early strength 7-inch and 9-inch reinforced concrete driveways. Limited construction of reinforced concrete sidewalks, and wheelchair ramps. Remove and replace storm sewer pipes with reinforced concrete storm pipes ranging in diameters from 12-in to 30-in, 18" x 29" arch pipes, 23" x 37" arch pipes, and 27" x 44" arch pipes. Removal and replacement of storm sewer manholes and inlets. Limited installation of 10-inch sanitary sewer, manholes and appurtenances. Installation of 8-inch water line, fire hydrants, and related appurtenances. Installation of proposed thermoplastics pavement markings and signage. Alternate 1 The alternate 1 improvements limits are from Airport Blvd (STA 32+88.74) to IH-45 southbound Feeder road, and includes the following improvements: Asphaltic concrete full depth reconstruction which includes asphaltic concrete, base and subgrade. Installation of monolithic curb and gutter, flush curb/gutter and doweled curbs. Construction of high early strength 7-inch reinforced concrete driveways. Limited construction of reinforced concrete sidewalks, and wheelchair ramps. Installation of proposed thermoplastic pavement markings and signage. Alternate 2 The alternate 2 improvements limits are from Airport Blvd (STA 32+88.74) to IH-45 southbound feeder road, and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Installation of 8-inch water line, fire hydrants, and related appurtenances. Alternate 3 The alternate 3 improvements limits are from STA 1+00 to STA 17+05.92, and includes the following improvements: Preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA). Cleaning/de-silting of existing reinforced concrete box (RCB) storm sewers. RCB storm sewer inside joint repairs. Estimate: $6M-$8M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. If offer is accepted, Contractor shall achieve Date of Substantial Completion within 425 days after Date of Commencement of the Work which includes 305 Days for Base Bid, 60 days for Alternate 1, 60 days for Alternate 2 as it must be in conjunction with Alternate 1, 0 days for Alternate 3 as it must be in conjunction with base bid, subject to adjustments of Contract Time as provided in the Contract. The Gulfgate Redevelopment authority/TIRZ 8 reserves the right to award the Base bid only, or the Base Bid along with any or all of the Alternates 1 through 3.
Bid Results
Roads / Highways
$6,170,217.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
June 3, 2024
W 8th St, Houston, TX
Related To This Project
Houston, TX
Bid Date: Aug 04 2021
Houston, TX
--
Houston, TX
Bid Date: Jun 01 2023
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Jun 08 2023
Houston, TX
Bid Date: Jun 06 2023
Houston, TX
Bid Date: Jun 02 2023
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.