Published June 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Plano, Texas. Completed plans call for paving for a 92,000-square-foot sidewalk / parking lot; and for site work for a water / sewer project.

Install shade structures to the dog park and subsurface drainage on the east end of the paddocks, install trail, irrigation repair and sod establishment. The location of this project is Bob Woodruff Dog Park, 2300 Shiloh Road in the City of Plano, Texas. This project is estimated at $821,114. Include a bid bond or a bid guarantee in the form of a cashier's check or certified check in an amount not less than five percent (5%) of the total maximum bid price. This is a guarantee that the bidder will enter into a contract and execute the performance bond and the payment bond on the forms provided in this olicitation. Checks shall be issued by a national or state bank and the bid bond shall be from a reliable surety company. A BID BOND or a CASHIERS CHECK in the amount of 5% of the amount bid must be received by City of Plano Procurement prior to the published bid closing date/time. The successful bidder must furnish a performance bond, on the form provided, in the amount of one hundred fifteen percent (115%) of the contract price. Successful bidder must also provide a material and labor payment bond, on the form provided, in the amount of one hundred percent (100%) of the contract price. Bonds must be from an approved surety company holding a permit from the State of Texas to act as surety, or other sureties acceptable to the Owner. Delivery of applicable bonds to the City no later than ten (10) days after notice of award is required. This project has 180 working days allowed for TOTAL completion, Monday-Friday, 7:00 AM - 6:00 PM. The amount for liquidated damages is anticipated to be $500.00 for each day work remains incomplet after the time specified. TBPE No. F-438 TBPLS No. 10076000 PROJECT #PR2022-026, 32-22181, 2213.072.100 Question Deadline 05/10/2024 at 2:00 PM CT Electronic Submission

Bid Results

Sidewalks / Parking Lot

$684,200.00

Public - City

Paving, Site Work

30

25

6

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Irrigation, Planting, Turf and Grasses, Sodding, Plants, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Material Storage, Bulk Material Storage

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
85
Bidding Soon
2,968
All Active Projects
1,236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bob Woodruff Dog Park Shade and Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.