Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2023 at 8:00 PM

Updated November 9, 2024

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

Construction of 90TH STREET PAVING PROJECT includes: pulverizing asphaltic pavement, excavation, grading, base aggregate dense, manhole and inlet adjustments, curb and gutter spot replacements, storm sewer pipe and related structures, curb ramp replacements, asphaltic pavement, pavement marking, and traffic and erosion control. Approximate quantities include: 14,200 square yards of pulverize asphaltic pavement, 3,300 tons of asphaltic pavement, 2,400 linear feet of concrete curb and gutter, 4,100 square feet of concrete sidewalk, 150 linear feet of concrete storm sewer pipe and 12 storm structures, 13 manhole and inlet adjustments, and 12,250 linear feet of pavement marking. \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ Project is to be substantially complete on, or before, October 13, 2023 QUESTIONS ABOUT THIS PLEASE CONTACT: Jason Feucht, P.E. Project Manager PHONE: 262-317-3356 EMAIL: Jason.Feucht@raSmith.com

Bid Results

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

22

12

7

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
143
Bidding Soon
2,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

Project location map

N 90th St, Milwaukee, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed