BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a transportation facility; and for site work for a water / sewer project.

This project provides for: Terminal 1-Lindbergh EMC: Chiller testing and parts replacement, control panel replacement, condenser pump replacement, chilled water expansion tank, structural steel installation, cooling tower modifications. Terminal 2-Humphrey EMC: Chiller testing and parts replacement, control panel replacement, condenser water valve and piping replacement. North Field Maintenance: Chilled water system upgrades including installation of new chiller, pump replacement, controls. General Office Building: Chilled water pump replacement.

Bid Results

Transportation Terminals

$1,437,800.00

Public - State/Provincial

Renovation, Site Work

38

19

27

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
141
Bidding Soon
1,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

July 24, 2023

Project location map

Multiple Locations, Minneapolis, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.