BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Holtville, California. Contact the soliciting agency for additional information.

The owner has selected a Construction Manager. The City of Holtville ("the City") intends to construct a Wetlands area along the Alamo River west of Holtville, utilizing grant funding from the United States Bureau of Reclamation ("BoR"). The Holtville Alamo River Wetlands Project ("Project") is a longtime collaboration between the City, the Imperial Irrigation District (IID), the County of Imperial, the Salton Sea Authority, local conservation group Desert Wildlife Unlimited (501.3c) and BoR. In the early 2000's, BoR deeded 15 acres to the City of Holtville, IID deeded 16 acres, and the City, acting on behalf of the Citizens Congressional Task Force, acquired the remaining acres of property needed to support the proposed Project. The 57.71 acre Project is located on one of the 36 priority sites identified by the Task Force for water quality improvement. The Task Force's mission is to improve water quality in the New and Alamo Rivers. These Wetlands will improve the water quality of the Alamo River, with a secondary benefit of creating valuable wetlands habitat. Engineering, environmental analysis, permitting and other work was completed by 2006 in anticipation of construction funding, but that did not come to fruition with the nation's economic downturn. In February, 2016, the City was apprised of a renewed funding opportunity and worked with the aforementioned stakeholders to revive the project, securing the funding. The existing design required refinement, along with procurement of required permits (all had expired) to move the Project forward. A Design engineer was subsequently secured, but delays in that process once again forestalled the project, however, the design was eventually approved and building permits have recently been secured.

Pre-Construction/Negotiated

Municipal

$4,240,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
109
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

img_map_placeholder

Multiple Locations, Holtville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.