BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Sausalito, California. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 8, 2023, project bids came in over Owner budget. Information regarding a rebid is not yet known. From orig solicitation: Installation of a retaining wall system on the uphill side of Bridgeway and includes but is not limited to clearing and grubbing, installation of a mechanically stabilized earth embankment system and drainage system on the slope as shown on the project plans and these specifications. The Project must be fully completed within 56 calendar days from the start date set forth in the Notice to Proceed. The estimated construction cost is $510,000 This Project requires a valid California contractor's license for the following classification(s): Class A - General Engineering. The Project is located adjacent to the south bound lanes of Bridgeway Blvd. below 268 and 254 Woodward Ave and is described as follows: Installation of a retaining wall system on the uphill side of Bridgeway and includes but is not limited to clearing and grubbing, installation of a mechanically stabilized earth embankment system and drainage system on the slope as shown on the project plans and these specifications.

Final Planning

Bridges / Tunnels

$1,277,700.00

Public - City

Paving, Site Work

8

8

18

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
168
Bidding Soon
3,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

September 25, 2023

Project location map

254 Woodward Ave, Sausalito, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.