BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sausalito, California. Contact the soliciting agency for additional information.

Project Information. Location and Description. The Project is located throughout the City limits, and the project is described as follows: Thoroughly clean gravity sewer pipelines through one or a combination of hydrojet, machine rod, and/or hand rod, dispose of all debris, and conduct all associated tasks including but not limited to mobilization, demobilization, notifications, traffic control, documentation, and project cleanup for the cleaning of approximately four miles of collector sewer pipelines ranging from 4-inches to 12-inches in diameter. The same four miles will be cleaned in the same manner once every quarter, for a total of eight cleaning cycles over the course of two years. License and Registration Requirements. License. This Project requires a valid California contractors license for the following classification(s): A-General Engineering Contractor, C-34 Pipeline, or C-42 Sanitation System. DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (DIR) to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Contract Documents. Prevailing Wage Requirements. General. Pursuant to California Labor Code 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Rates. The prevailing rates are on file with the City and are available online Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code 1771.4. Instructions to Bidders.All bidders should carefully review the Instructions to Bidders and contract documents for more detailed information before submitting a Bid Proposal. Question Submission. The last day to submit questions prior to bid opening is Monday March 28, 2022.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
49
Bidding Soon
1,726
All Active Projects
733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.