BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Littleton, Colorado. Completed plans call for site work for a water / sewer project.

The Work shall be completed under one Contract consisting of all labor, skill and materials required to properly construct the Project. The Project consists of the following primary components o Installation of a new submersible pump lift station above a new 8 foot diameter wet well o Installation of approximately 3,700 feet of 10 - inch diameter force main pipeline o Installation of lift station site improvements including yard piping, paving and grading, and fencing o Electrical power and pump control improvements for the new lift station o Removal of existing and installation of new lap siding, air louvers, trim and roofing on an existing building which houses an emergency generator o Surface restorations along the length of the force main pipeline o Restoration of five existing manholes Bid will be received on both a lump sum basis for the lift station and lift station site improvements and a unit price basis for the force main pipeline. Each Bid shall be accompanied by a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Colorado, payable to the Ken-Caryl Ranch Water and Sanitation District, in a sum equal to five (5) percent of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a Contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. The successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond, each for 100 percent of the Bid amount, as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Work. The Work shall be substantially completed within 280 calendar days and shall be completed and ready for final payment within 308 calendars days of Notice-to-Proceed. The Owner reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the Owner.

Bid Results

Water / Sewer

$2,480,000.00

Public - County

Site Work

53

21

7

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
58
Bidding Soon
1,009
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

July 24, 2023

img_map_placeholder

To Be Determined, Littleton, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.