BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in West Donegal Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project consists of work on SR 4025-012, SR 0230-049, SR 4018-010, T-321 (Colebrook Road), and T-335 (Cloverleaf Road) including resurfacing the existing roadway using Superpave wearing and scratch courses, milling, base replacement, minor drainage improvements, curb installation, and guide rail replacement, along with other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 4025, SECTION 012, in LANCASTER COUNTY, MOUNT JOY & WEST DONEGAL TOWNSHIPS, on SR 4025 (Colebrook Road) from SR 4018 (Harrisburg Ave) to SR 4010 (Mount Pleasant Road) at Segment 0010 Offset 0000 to Segment 0050 Offset 2002, length 8,259.00 linear feet (1.56 mile), SR 0230 (Main St) from Segment 0150 Offset 0092 to Segment 0150 Offset 0842, length 548.00 feet (0.104 mile), SR 4018 (Harrisburg Ave) from Segment 0030 Offset 2908 to Segment 0040 Offset 0077, length 361.00 feet (0.068 mile), T-321 (Colebrook Road) from Station 287+50 to Station 289+21, length 71.00 feet (0.013 mile), and T-335 (Cloverleaf Road) from Station 372+85.69 to Station 374+50, length 64.31 feet (0.012 mile), for a total project length of 9,303.31 feet (1.762 miles). Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays PennDOT - Cloverleaf Rd and Colebrook Rd Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$2,464,003.00

Public - State/Provincial

Paving, Site Work

36

7

8

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
79
Bidding Soon
1,841
All Active Projects
796
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 31, 2023

img_map_placeholder

Cloverleaf Rd & Colebrook Rd, West Donegal Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.