Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Woodstock, Illinois. Conceptual plans call for site work for a road / highway.
McHenry County Division of Transportation desires to contract with a qualified engineering firm to assist the County of McHenry in developing Phase I Preliminary Engineering with an option for Phase II Design Engineering for safety improvements at three (3) intersections located in McHenry County. The intersections are Spring Grove Road at Miller Road, Alden Road at O'Brien Road, and Maple Street at Coral Road. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. Maple Street at Coral Road: The intersection of Maple Street and Coral Road is located in Unincorporated McHenry County, Riley Township just south of the City of Marengo. Both Maple Street and Coral Road are under the jurisdiction of McHenry County Division of Transportation. The 4-legged intersection is 2-way stop controlled. Maple Street is stop controlled. Coral Road is at a slight skew. The surrounding land area is mixed between agricultural and residential uses Each location will have a separate Project Development Report and will be processed independently through IDOT. Anticipated Work Items may include, but are not limited to the following: Perform necessary survey work Perform drainage, floodplain, and wetland studies Prepare crash analysis & design traffic data The anticipated construction cost for EACH intersection improvement is: $3,000,000 November 8, 2023 Vendor Questions Submitted no later than 4:00 PM (CST) Submit by E-Mail to purchasing@mchenrycountyil.gov; CC E-mail: gwbauernfeind@mchenrycountyil.gov November 14, 2023 Vendor Questions Answered no later than 4:00 PM (CST) Posted to the County Website as an Addendum March 25, 2024 Project Starts (Anticipated) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$3,000,000.00
Public - County
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2024
Intersection of Maple St and Coral Rd, Woodstock, IL
Related To This Project
Woodstock, IL
Bid Date: May 31 2023
Woodstock, IL
--
Woodstock, IL
Bid Date: Jun 09 2023
Woodstock, IL
Bid Date: Jul 27 2023
Woodstock, IL
Bid Date: May 30 2019
Woodstock, IL
Bid Date: Apr 25 2019
Woodstock, IL
Bid Date: Mar 29 2019
Woodstock, IL
Bid Date: Dec 20 2018
Woodstock, IL
Bid Date: Nov 20 2019
Woodstock, IL
Bid Date: Apr 18 2019
Woodstock, IL
Bid Date: Nov 28 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.