BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a road / highway in Woodstock, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 12, 2025, project awarded and construction started in 2024. McHenry County Division of Transportation desires to contract with a qualified engineering firm to assist the County of McHenry in developing Phase I Preliminary Engineering with an option for Phase II Design Engineering for safety improvements at three (3) intersections located in McHenry County. The intersections are Spring Grove Road at Miller Road, Alden Road at O'Brien Road, and Maple Street at Coral Road. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. Maple Street at Coral Road: The intersection of Maple Street and Coral Road is located in Unincorporated McHenry County, Riley Township just south of the City of Marengo. Both Maple Street and Coral Road are under the jurisdiction of McHenry County Division of Transportation. The 4-legged intersection is 2-way stop controlled. Maple Street is stop controlled. Coral Road is at a slight skew. The surrounding land area is mixed between agricultural and residential uses Each location will have a separate Project Development Report and will be processed independently through IDOT. Anticipated Work Items may include, but are not limited to the following: Perform necessary survey work Perform drainage, floodplain, and wetland studies Prepare crash analysis & design traffic data The anticipated construction cost for EACH intersection improvement is: $3,000,000 November 8, 2023 Vendor Questions Submitted no later than 4:00 PM (CST) Submit by E-Mail to purchasing@mchenrycountyil.gov; CC E-mail: gwbauernfeind@mchenrycountyil.gov November 14, 2023 Vendor Questions Answered no later than 4:00 PM (CST) Posted to the County Website as an Addendum March 25, 2024 Project Starts (Anticipated) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,000,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
294
Bidding Soon
3,873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

Project location map

Intersection of Maple St and Coral Rd, Woodstock, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.