BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Akron, Ohio. Completed plans call for the renovation of a library.

This project includes HVAC upgrades at two separate library facilities. Norton upgrades consis of replacing an indoor air handler, its associated condensing unit, and boiler plant replacements. Odom upgrades consist of replacement of three packaged rooftop air handling units. Opinion of probable construction cost for this project is $830,000. A Pre-bid meeting at ASCPL Odom Branch Library located at 600 Vernon Odom Blvd., Akron, OH 44307, will be directly following the close of the Norton meeting. This meeting is optional. All questions concerning the project shall be directed by email to Joe Cavanaugh, PE, CEM. of Scheeser Buckley Mayfield: jcavanaugh@sbmce.com. The last day to submit questions is Wednesday, June 14th at 3:00 p.m. The Akron-Summit County Public Library reserves the right to reject any and all bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive, unbalanced or conditional bids. Also, the Library reserves the right to reject the bids of any bidder if the Library believes it would not be in the best interest of the Library to make the award of that bid; whether because the bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standards or criteria established by the Library.

Award

Library

$732,655.00

Public - County

Renovation

28

13

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
66
Bidding Soon
1,177
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

July 24, 2023

img_map_placeholder

60 S High St, Akron, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.