BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a development in Dolores, Colorado. Completed plans call for site work for a development.

Sol : 1240LT23Q0060, 1240LLT24R0023 This Cattle Guard Replacement Contract Located Within the San Juan National Forests is Intended to Replace Non-functional Cattle Guards Across the Dolores and Columbine Ranger Districts (See Attached Road Listing). Contractor Will Be Responsible for Purchasing and Installing Cattle Guard Bases, Running Surfaces and Wings as Well as Disposing of the Removed Material Off of Federal Land. Bedding Material and Approach Aggregate Will Be Required With Each Cattle Guard. Minor Fence Work May Be Required to Tie the Range Allotments Into the Wings. Traffic Control Will Be the Responsibility of the Contractor With Delays Not Exceeding 1/2 Hour. Terrain Across the Forest Varies Between Flat Mesa Tops and Steep Winding Mountain Roads. the Majority of This Work Will Occur on Gravel Surfaced Level 3 and 4 Roads as Defined in Fsh 7709.58, 12.3. All Projects Can Be Reached Within a Two Hour Drive From Durango, Colorado. Typical Operating Season is May 1 - Nov. 30. Operations Shall Avoid Freeze Thaw Conditions and Timing Should Be Approved by the Co. THIS WORK IS LOCATED THROUGHOUT THE SAN JUAN NATIONAL FOREST IN SOUTHWEST COLORADO BETWEEN DOVE CREEK AND WOLF CREEK. MAGNITUDE OF CONSTRUCTION PROJECT : Between $500,000 and $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Conservation and Development

$1,000,000.00

Public - Federal

Site Work

8

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
68
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

June 3, 2024

img_map_placeholder

To Be Determined, Dolores, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.