BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Ephraim, Utah. Completed plans call for the renovation of a educational facility.

Replace existing chiller & chilled water pump. Construction Cost Estimate: $520,000.00 The project described herein is the Snow College Performing Arts Building Chiller Replacement. This work shall include all labor, materials, equipment, fixtures, and devices for the entire mechanical work and a complete operating and tested installation as required for this project. B. This Division will schedule the boiler inspection and pay for all costs associated with certifying the boiler with the state

Bid Results

Educational

$428,514.00

Public - State/Provincial

Renovation

13

10

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

Project location map

251 E Center St, Ephraim, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.