BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Pelican, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

**As of July 13, 2023, project was awarded to American Asphalt of Wisconsin, awarded amount is $99,075.00.** Located on Wildflower Bay Rd starting approximately 300' south of Luke Julia Rd and going south for 257 LF. Project includes the following: Remove the existing pavement (Milling is acceptable) Remove existing culvert and replace with a 38' x 15" Double Wall HDPE Culvert Excavate 12", place geo-grid, and place 12" stone in areas that measure 75' x 20' and 110' x 16' Fine grade and compact the base to promote positive drainage. Pave 20' wide on ends and widen to 24' wide in the corner. Pavement thickness to be 2.25" with a 4 LT 58-28S Mix Type Place 2' wide shoulder on each side of the road The Town has the right to accept or reject any or all bids. For further information and bid specifications, please contact Road Supervisor, Mike Carroll, at 715-360-0493 Mike Ring, Clerk Town of Pelican 4095 Pine Ln Rhinelander WI 54501 Bid Results : Faust Lake Road : American Asphalt - $58,825.00 Wildflowers Bay and Pelican Ranch Roads : American Asphalt - $40,250.00

Award

Roads / Highways

$99,075.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
10
Bidding Soon
239
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

July 5, 2023

Project location map

Multiple Locations, Pelican, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.