BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a municipal facility in Auburn, California. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Deadline to post Q&A to Cal eProcure 05/31/2023 The California Conservation Corps (CCC) Placer Center desires the selective interior repair and repainting of the Corpsmember Advisory Board (CAB) Building and Corpsmember Development (CMD) Building. A. Scope of Work CMD FLOOR - Remove existing base and flooring down to substrate, making needed repairs, patching, or replacement to ensure a sound substrate for new flooring installation following manufacturers instructions. Install (equal to or better than) Armstrong Imperial Texture Standard Excelon, #51938 Willow Green and #51904 Sterling in a checkerboard pattern. The new wall base will be ROPPE #177 Steel Blue. The area includes a hallway and five adjacent offices and will be designated on a floor plan provided during pre-bid job walk. FLOOR - Remove existing base and flooring down to substrate, making needed repairs, patching, or replacement to ensure a sound substrate for new flooring installation following manufacturers instructions. Install ARMSTRONG Imperial Texture Standard Excelon, #51882 Serene Blue and #51904 Sterling in a checkerboard pattern. The new wall base will be ROPPE #177 Steel Blue. The area includes the Pool Room and TV Room and will be designated on a floor plan provided during pre-bid job walk. WALLS Remove built-in wall cabinets in TV room. Remove all incidental items including nails, hooks, staples, chair mold, wainscot, etc. to bare walls. Clean all walls thoroughly using soap and water to remove foreign matter, dirt, dust etc. to ensure proper paint adhesion. Repair/patch all wall surfaces to uniform substrate. Remove and replace all switch plates and receptacles with LEVITON Decora style devices in Gray color. Light switches are to be dimmable. Paint following manufactures instructions using SHERWIN-WILLIAMS Marshmallow SW 7001 for main body color and an accent wall of SHERWIN-WILLIAMS Light French Grey SW 0055. All finishes to be glossy. CEILINGS Prep ceiling as with walls. Remove all lighting fixtures and replace with LITHONIA LIGHTING CPANL 1X4 40LM SWW7 120 TD DCMK 1 Ft. x 4 Ft. LL CPANL LED Flat Panel with 4000 Lumens. Light fixture to be dimmable with six fixtures in each room. Paint with two coats of white ceiling paint in a flat finish. Any item specified may be substituted with equal to or better than. The contractor will provide spec/tech sheets of both the item listed and the substitute item and provide a narrative as to why the substituted item is equal to or better than. The decision is at the sole discretion of the Project Manager Clean-Up During the project work the contractor will keep all work surfaces clean and free of grit, dirt, or debris. During and following the project completion the contractor will remove all excess materials and spoils from job site. Ensure that any damage that occurs because of the work is appropriately and immediately repaired. Inspection The contractor will notify the project manager at minimum three business days in advance for a final inspection/punch list review. Warranty Minimum one (1) year contractor's workmanship warranty. All warranties to be provided in writing, two (2) copies. For more info, please check the attachments.

Post-Bid

Municipal

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
117
Bidding Soon
1,887
All Active Projects
760
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.