BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kennewick, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 1, 2023, project was awarded to Ellison Earthworks LLC, awarded amount is $2,077,667.25** This project consists of constructing a new traffic signal system to accommodate a new right-turn lane for added turning capacity for west-bound traffic turning northbound onto Columbia Center Blvd. In addition, the proposed work will require the installation of a roundabout at Colorado St. and Deschutes Ave. The proposed work includes the installation of curb, gutter, sidewalk, traffic curbing, concrete traffic islands, retaining walls, driveways, storm drainage, utility trench excavation, landscape and irrigation restoration, HMA patching and overlay, striping, signage and a new signal system. Along Deschutes Ave the entire intersection at Columbia Center Blvd and at Colorado St. will be overlaid with hot mix asphalt and restriped. This proposed work will be in preparation to widen Columbia Center Blvd north of Deschutes Ave, adding a 3rd lane for northbound and southbound through traffic on Columbia Center Blvd to Quinault Ave. Majority of signal components including poles, mast arms, heads, controller cabinet and street light poles and luminaires have been pre-purchased and stockpiled at the City shops. This project is funded by State Transportation Improvement Board (TIB) dollars. Therefore, no Disadvantaged Business Enterprise or Training goals are required for this contract work. The City will post any Addenda and Bidder questions & answers solely through Public Purchase. The City cannot guarantee receipt of all bidder documentation to outside third-party centers. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Kennewick_ The City of Kennewick reserves the right to waive any informalities or to reject any or all bids. For questions or additional information, please call 509-585-4287.

Award

Roads / Highways

$2,077,667.00

Public - City

Paving, Site Work

29

15

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
8
Bidding Soon
158
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

August 1, 2023

img_map_placeholder

W Deschutes Ave & N Columbia Center Blvd, Kennewick, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.