BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a road / highway in Hobart, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Roundabout and Corridor Improvements: 61st and Wisconsin; 69th and Colorado City Question Deadline 07/09/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Contractor in writing. Contact information and submittal procedures for such questions are as follows: Attorney, Mr. Ryan Cook, tel. (219) 931-0560, email address: rcook@eichhorn-law.com. The Project includes the following Work: The project scope includes but is not limited to: installation of landscape plantings, decorative mulch, landscape boulders, decorative concrete, flagpoles, and lighting. The project shall also include demolition of existing irrigation system and removal of soil as required to construct and install improvements. The Project has an expected Substantial Completion to be fulfilled by November 16th, 2025, and Final Completion to be fulfilled by May 16th, 2026. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Bidding and Contract Documents, including Bidders Procedure Checklist for Construction Services, Official Notice to Bidders, Instructions to Bidders, Bid Proposal Form, Form of Bid Bond, Agreement, Form of Performance Bond, Form of Payment Bond Each Bid must be accompanied by a certified or cashier's check on a solvent bank or trust company, drawn to the order of the City of Hobart Redevelopment Commission, or an acceptable Bid Bond, in an amount of not less than ten percent (10%) of the total Bid for the Project. This sum is a guarantee that, if the Bid is accepted, a contract will be entered into and its performance properly secured. Bid security of all excepting the three lowest, responsive, responsible Bidders will be returned within thirty (30) days after the opening of bids. Any Bidder whose Bid security has been retained may, after thirty (30) days from the opening of Bids, request return of his Bid security provided he has not been notified of acceptance of his Bid. The Bid security of the successful Bidder will not be returned until Bidder delivers the required signed contract and Performance Bond. Any Bid may be withdrawn prior to the scheduled time for the opening of Bids or authorized postponement thereof. However, no Bid may be withdrawn for sixty (60) days after the scheduled time for opening, unless agreed to by the OWNER. Questions about the drawings and specifications should be directed to the Landscape Architect via email address: munderwood@structurepoint.com Instructions to Bidder s.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

10

13

16

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
243
Bidding Soon
3,163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.