Published June 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a mixed-use development in Springfield, Missouri. Completed plans call for site work for a educational facility.

The Work shall commence July 12, 2023. Substantial Completion shall be July 28, 2023. Final Completion shall be August 25, 2023. A site visit is required. Contact Richard Spartan, 417-402-7199, for opportunities. The tree within Zone 1 will be removed and exposed stump will be ground under separate contract. The Contractor shall further grind the stump to a depth of eighteen inches (18") under final grade. The sidewalk shall have a one foot (1') wide drain installed flush with sidewalk where shown with red rectangle on Image 2. Grate shall be equal to Dura Trench 12" wide ADA/Heel Proof galvanized iron slotted trench drain grate. The timber outlined in orange on Image 2 shall be removed. The Contractor shall create a swale in Zone 1 from the bench to the building; the lowest point shall align with the red line shown on Image 2 and slope toward the sidewalk drain. The area within Zone 1 shall receive sod. The swale shall be continued west of the sidewalk drain approximately four feet (4') and blended into existing grade. Zone 2 shall have four inches (4") of top soil added along approximately one hundred feet (100') on the south side next to the building, tapering to existing grade approximately four feet (4') to the north. Zone 2 shall receive grass seed and straw. Question Deadline 05/29/2023 at 2:35 PM CT

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
25
Bidding Soon
361
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

July 12, 2023

img_map_placeholder

2352 S Weaver Ave, Springfield, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.