Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 6, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a mixed-use development in Springfield, Missouri. Completed plans call for site work for a educational facility.
The Work shall commence July 12, 2023. Substantial Completion shall be July 28, 2023. Final Completion shall be August 25, 2023. A site visit is required. Contact Richard Spartan, 417-402-7199, for opportunities. The tree within Zone 1 will be removed and exposed stump will be ground under separate contract. The Contractor shall further grind the stump to a depth of eighteen inches (18") under final grade. The sidewalk shall have a one foot (1') wide drain installed flush with sidewalk where shown with red rectangle on Image 2. Grate shall be equal to Dura Trench 12" wide ADA/Heel Proof galvanized iron slotted trench drain grate. The timber outlined in orange on Image 2 shall be removed. The Contractor shall create a swale in Zone 1 from the bench to the building; the lowest point shall align with the red line shown on Image 2 and slope toward the sidewalk drain. The area within Zone 1 shall receive sod. The swale shall be continued west of the sidewalk drain approximately four feet (4') and blended into existing grade. Zone 2 shall have four inches (4") of top soil added along approximately one hundred feet (100') on the south side next to the building, tapering to existing grade approximately four feet (4') to the north. Zone 2 shall receive grass seed and straw. Question Deadline 05/29/2023 at 2:35 PM CT
Post-Bid
Sidewalks / Parking Lot
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2023
July 12, 2023
2352 S Weaver Ave, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Jun 06 2023
Springfield, MO
Bid Date: Jun 22 2023
Springfield, MO
Bid Date: Jun 16 2023
Springfield, MO
Bid Date: Jun 27 2023
Springfield, MO
Bid Date: Jun 13 2023
Springfield, MO
Bid Date: Jun 08 2023
Springfield, MO
Bid Date: Jun 15 2023
Springfield, MO
Bid Date: Jun 15 2023
Springfield, MO
Bid Date: Jun 05 2023
Springfield, MO
Bid Date: May 31 2023
Springfield, MO
Bid Date: Jun 16 2023
Springfield, MO
Bid Date: May 31 2023
Springfield, MO
Bid Date: Jun 15 2023
Springfield, MO
Bid Date: Jun 02 2023
Springfield, MO
Bid Date: May 23 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed