BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a mixed-use development in Visalia, California. Working plans call for the construction of a 7,500-square-foot, one-story above grade educational facility; and for site work for a educational facility.

**As of August 29,2023, the project was puched back a month** Bids must be accompanied by a bidder s bond, cashier s check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. The project consists of a new 1-story, pre-manufactured modular building intended for training instruction. The building will be Type V-B construction, nonsprinklered, and of B occupancy type. There will be plumbing, mechanical, and electrical work to accommodate the intended use. The new modular building will be an addition to the VCIS campus site and the exterior work will be limited utility connection five (5) from perimeter of the building. 2. Design of modular building, within the parameters set out in this bid. 3. Approval through the HCD. 4. Construction of modular buildings. 5. Installation of ALL underground utilities to within 5' of building (including, plumbing, gas, water, sewer, fire lines, storm drain, electrical and LV conduit, etc.). 6. Installation of building slab. 7. Placement of building. 8. Building Finishes & Cabinets. 9. See section 13 16 00 Prefabricated modular structures for additional requirements. B. Type of Contract: Project will be constructed under a single contract. 1.5 WORK BY OWNER A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

Final Planning

Educational

$500,000.00

Public - City

New Construction, Site Work

21

19

8

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
22
Bidding Soon
383
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.