Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Visalia, California. Working plans call for the construction of a 7,500-square-foot, one-story above grade educational facility; and for site work for a educational facility.
**As of August 29,2023, the project was puched back a month** Bids must be accompanied by a bidder s bond, cashier s check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. The project consists of a new 1-story, pre-manufactured modular building intended for training instruction. The building will be Type V-B construction, nonsprinklered, and of B occupancy type. There will be plumbing, mechanical, and electrical work to accommodate the intended use. The new modular building will be an addition to the VCIS campus site and the exterior work will be limited utility connection five (5) from perimeter of the building. 2. Design of modular building, within the parameters set out in this bid. 3. Approval through the HCD. 4. Construction of modular buildings. 5. Installation of ALL underground utilities to within 5' of building (including, plumbing, gas, water, sewer, fire lines, storm drain, electrical and LV conduit, etc.). 6. Installation of building slab. 7. Placement of building. 8. Building Finishes & Cabinets. 9. See section 13 16 00 Prefabricated modular structures for additional requirements. B. Type of Contract: Project will be constructed under a single contract. 1.5 WORK BY OWNER A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
Final Planning
Educational
$500,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2023
February 29, 2024
424 N Lovers Ln, Visalia, CA
Related To This Project
Visalia, CA
Bid Date: Apr 22 2021
Visalia, CA
Bid Date: Jul 16 2020
Visalia, CA
--
Visalia, CA
Bid Date: Jun 22 2023
Visalia, CA
--
Visalia, CA
--
Visalia, CA
--
Visalia, CA
Bid Date: Jul 07 2023
Visalia, CA
--
Visalia, CA
--
Visalia, CA
--
Visalia, CA
Bid Date: Jul 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.