EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Florence, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work is located on the Thornton Road alignment between Interstate 8 and Selma Highway, totaling approximately 7,500 linear feet. This segment of Thornton Road is located in Pinal County and consists of an existing 40' wide paved roadway that provides public access to residences. Improvements north of the Selma Highway section line are within the city of Casa Grande. The work at the Interstate 8 interchange off-ramp of this project is within the Arizona Department of Transportation (ADOT) right-of-way (R/W). Questions Due Date: May 25th 2023, 5:00 PM MST Contact Information: Lorina Gillette, Lorina.Gillette@pinal.gov Questions concerning this project must be submitted through the project site in online. Work items on this project include: New widened roadway with drainage improvements Removing asphaltic concrete Installing aggregate base course, asphaltic concrete, curb and gutter, scuppers and culverts Extension of existing SCID irrigation facilities in two locations Work in the ADOT ROW at the I-8 off-ramp Earthen/rip rap channel and basins Signing and marking

Award

Roads / Highways

$6,524,033.00

Public - County

Paving, Site Work

82

9

37

7

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
28
Bidding Soon
614
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

August 7, 2023

img_map_placeholder

Thornton Road, Florence, AZ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.