Published June 15, 2023 at 8:00 PM

Updated January 26, 2024

Demolition and renovation of a military facility in Fairfield, California. Completed plans call for the renovation of a military facility; and for the demolition of a military facility.

1. SCOPE: Supply all material, equipment, and labor necessary to perform all operations in strict accordance with these specifications in this SOW. The contractor is responsible for all required measurements and drawings. 1.1 Hours of normal operations shall be from 0730 to 1630, Monday - Friday, to exclude all federal holidays. All other dates and/or times must be approved by the government. Clean up shall be done daily within these hours, e.g. pick up scraps, vacuum as needed. 2. LOCATION: All work on this project is to be performed at Travis Air Force Base, CA. 3. DESCRIPTION OF WORK: The following outline of the principle features of work does not in any way limit the responsibility of the contractor to perform all work and furnish all materials to do a complete job within the intent and scope of the specifications, sketches, drawings and contract. General construction consists of the following items: 3.1. Contractor shall be responsible for demolition and abatement of existing drywall materials and mold. The contractor will isolate work areas above abatement areas using critical barriers in order to create a negative pressure enclosure. Remove approximately total of 105 sq. ft. of drywall with visible signs of microbial growth and water damage. Remove damaged pipe duct insulation. Clean wall cavities. HEPA Vacuum and wet wipe containment - apply anti-microbial solution. The contractor will provide all labor, equipment and materials to remove approximately total of 105 square feet mold, replace insulation, drywall, texture, prime, and paint (Sherwin Williams 8646, PROMAR 200, ZERO VOC., EG SHELL.) The contractor shall perform an air sample testing prior to the removal of containment. Contractor will coordinate all work with POCs listed below. The contractor will provide OSHA notification for this class mold project. All work shall be accomplished by mold workers. Question Date 5 June 2023 9AM Hours of normal operations shall be from 0730 to 1630, Monday - Friday, to exclude all federal holidays. All other dates and/or times must be approved by the government. Clean up shall be done daily within these hours, e.g. pick up scraps, vacuum as needed. The following outline of the principle features of work does not in any way limit the responsibility of the contractor to perform all work and furnish all materials to do a complete job within the intent and scope of the specifications, sketches, drawings and contract. General construction consists of the following items: Contractor shall be responsible for demolition and abatement of existing drywall materials and mold. The contractor will isolate work areas above abatement areas using critical barriers in order to create a negative pressure enclosure. Remove approximately total of 105 sq. ft. of drywall with visible signs of microbial growth and water damage. Remove damaged pipe duct insulation. Clean wall cavities. HEPA Vacuum and wet wipe containment - apply anti-microbial solution. The contractor will provide all labor, equipment and materials to remove approximately total of 105 square feet mold, replace insulation, drywall, texture, prime, and paint (Sherwin Williams 8646, PROMAR 200, ZERO VOC., EG SHELL.) The contractor shall perform an air sample testing prior to the removal of containment. Contractor will coordinate all work with POCs listed below. The contractor will provide OSHA notification for this class mold project. All work shall be accomplished by mold workers.

Post-Bid

Military

$100,000.00

Public - Federal

Demolition, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
17
Bidding Soon
1,890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

August 14, 2023

Project location map

To Be Determined, Fairfield, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.