BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Saint Paul, Minnesota. Completed plans call for the renovation of a laboratory facility.

**As of July 11, 2023, project was awarded to Hunt Electric Corporation, but awarded amount is not available.** The Board of Regents of the University of Minnesota (the "University") is requesting Proposals to provide construction services to replace a service disconnect in Gortner Laboratory (the "Project"). The University of Minnesota Energy Management, along with Capital Project Management, would like to replace a service disconnect in Gortner Laboratory, located on the St. Paul campus. The service disconnect switchboard section needs to be replaced or modified to accommodate a new service disconnect. The existing service conductors between the transformers and disconnect are bus duct. As part of this Project, the bus duct will be replaced with conduit and wire service conductors. Lump Sum Contract should include engineering design services by contractor to provide plans and specifications required for permitting and as-builts. Refer to the attached Summary of Work document for additional Project information. The total construction budget for this Project is $400,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than June 28, 2024. Deadline for RFP Questions June 6, 2023 at Noon

Award

Laboratories

Public - State/Provincial

Renovation

7

8

13

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
64
Bidding Soon
1,698
All Active Projects
592
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 13, 2023

July 13, 2023

June 28, 2024

img_map_placeholder

1479 Gortner Ave, Saint Paul, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.