Demolition, site work, paving and new construction of a bridge / tunnel in Monroe Township, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Each proposal must contain the full name of the party or parties making the same and all persons interested therein, and be accompanied, pursuant to Section 153.54 of the Ohio Revised Code, by a satisfactory BID GUARANTY: either a BID BOND or a BID AND PERFORMANCE PAYMENT BOND executed by the bidder and an acceptable surety, in an amount equal to one hundred percent (100%) of the total amount for each individual proposal, or by a certified check, cashieris check, or a letter of credit pursuant to Chapter 1305 of the Ohio Revised Code in an amount equal to ten percent (10%) of the total amount for each individual proposal, payable to Richland County Board of Commissioners as a guarantee that if the proposal is accepted, a contract will be entered into. The Owner of the project is the Richland County Board of Commissioners. The Owner requires that all work associated with the project be completed before November 17, 2023. Only ODOT pre-qualified contractors for Work Type 20, Level One Bridge, are eligible to submit bids for this project. Pre-qualification must be in force at the time of the bid, at the time of the award, and through the life of the construction contract. A valid Certificate of Compliance with Affirmative Action Programs, issued by the State EEO Coordinater dated prior to the date fixed for the opening of bids to be presented at the time of the bid opening. Attention of bidders is particularly called to the prevailing wage rates to be paid under the contract. ENCOURAGING DIVERSITY, GROWTH AND EQUITY (EDGE) REQUIREMENT. EDGE participation goals have been set on this project. The goal may be met if the Contractor is EDGE certified or by subcontracting to certified EDGE firms. EDGE certified firms are those who have been certified by the Ohio Department of Administrative Services. If not EDGE certified, the Contractor must use its best efforts to solicit quotes from and to utilize EDGE subcontractors/suppliers on this project. EDGE Goal 5% The estimated construction cost is $405,000.00

Award

Bridges / Tunnels

$445,479.00

Public - County

Demolition, New Construction, Paving, Site Work

31

5

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
71
Bidding Soon
1,483
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 7, 2023

img_map_placeholder

Tucker Rd, Monroe Township, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.