Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Detroit, Michigan. Completed plans call for the renovation of a educational facility.
Laundry room operations cannot cease during the term of this contract. Work required to relocate the laundry room will occur first, beginning with all necessary preparations in the existing storage room being completed, then relocation and installation of all appliances, then demolition work in the former laundry room, then construction to create the new steam rooms. Contractor shall provide a schedule of these operations. Architectural & Structural 1. Remove & relocate laundry room wall & base cabinets. 2. Remove (2) existing masonry wing walls in men's & women's public locker rooms; remove (2) existing hollow metal doors & frames at existing laundry room as indicated; repair floor & ceilings, close openings w/ masonry to match existing. 3. Remove existing suspended ceiling in laundry room. 4. Construct 8" block masonry wall; 1/2" Durock on 2x6 structural metal stud ceilings (8'-0" a.f.f. w/ slope); 1/2" Durock on 2x4 structural metal stud seating (20" & 40" a.f.f.); all at men's & women's steam rooms. 5. Ceramic tile finish to match public locker rooms at floor, walls, ceilings (8'-0" a.f.f. w/ slope) & seating of men's and women's steam rooms. 6. Install new (2) 21" x 116" bomb bay style steam unit access panels & framing in existing suspended ceiling above towel desk, modify existing ceiling as required. 7. Install new Amerec doors, frames & hardware w/insulated glass lites to enter men's & women's steam rooms. 8. Waterproof men's & women's steam room construction as required. 9. Sawcut & remove existing 4" concrete floor, pour new 42" x 60" x 14" thick concrete slab for new commercial washer mounting, tie existing floor into new slab w/#4 rebar 12" long, 12" o.c. Mechanical 1. Remove lint trap & dryer exhausts from existing laundry room. 2. Remove existing HVAC ductwork, registers & grilles from existing laundry room. 3. Install (3) new metal dryer exhaust pipes ((1) 8" dia. & (2) 4" dia.) for (1) new commercial dryer & (2) existing relocated stacked dryers; vent to outside beneath stair and through exterior wall. Electrical 1. Remove existing lighting & suspended ceiling in laundry room. 2. Completely remove and properly terminate all existing electrical circuits, boxes, switches, outlets, fixtures, etc. In existing laundry room to prepare for new electrical work in men's & women's steam rooms. 3. Install (1) new led waterproof light fixture each in men's & women's steam room w/waterproof switch. 4. Provide (3) new electrical hookups at existing storage room for new commercial gas dryer, new commercial washer and relocated existing dryer stack. 5. Provide (2) new duplex receptacles at relocated wall & base cabinets in existing storage room. 6. Run new electrical power & control lines to provide complete installation of (2) new electric steam generation units w/controls for new men's & women's steam rooms mounted overhead on steam room ceiling construction (power from panel RP-1A in southwest corner of building). 7. Extend existing dryer stack circuit from former laundry room. 8. Install new circuits for commercial washer & dryer from panel RP-1A in southwest corner of building. 9. Cut & remove existing gypsum board ceiling @ soffits to install new electrical circuits & conduit. Patch, repair & paint upon completion. Plumbing 1. Remove existing laundry room trench drain, floor drain, sink, cleanout, and existing washer & dryer hookups to prepare for steam rooms & steam equipment closet. 2. Terminate all laundry room water supplies, waste lines & gas lines. 3. Run new gas line from existing laundry location to new laundry location for (2) relocated stacked gas dryers and (1) new commercial gas dryer. 4. Run new water lines to provide complete installation of (2) new steam generation units w/controls for new men's & women's steam rooms, located overhead atop new steam room ceilings. 5. Run new hot & cold water lines from existing laundry location to new laundry location for (1) new commercial washers. 6. Install 4' trench drain in new laundry area tied into existing sanitary line at floor sink. 7. Install (2) new floor drains at men's & women's steam rooms. 8. Install (2) new steam outlets at men's & women's steam rooms tied to (2) new steam units installed overhead. 9. Install new yard drain in dryer vent well tied to existing 4" storm line. Fire Suppression 1. Relocate existing piping & sprinkler heads to insure (1) new recessed & concealed waterproof sprinkler head each is in men's steam room & women's steam room ceilings.
Under Construction
Educational
$399,984.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2023
July 17, 2023
1001 W Fort St, Detroit, MI
Related To This Project
Detroit, MI
Bid Date: Jun 12 2023
Detroit, MI
Bid Date: Sep 14 2023
Detroit, MI
Bid Date: Jul 07 2023
Detroit, MI
Bid Date: Jul 07 2023
Detroit, MI
Bid Date: Jul 06 2023
Detroit, MI
Bid Date: Jun 06 2023
Detroit, MI
Bid Date: Jun 30 2023
Detroit, MI
Bid Date: Jul 05 2023
Detroit, MI
Bid Date: Aug 17 2023
Detroit, MI
Bid Date: May 26 2023
Detroit, MI
Bid Date: Jun 12 2023
Detroit, MI
Bid Date: Jul 05 2023
Detroit, MI
Bid Date: Jun 08 2023
Detroit, MI
Bid Date: Jun 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.