BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2024 at 8:00 PM

Updated April 19, 2024

Site work and paving for a mixed-use development in Douglas, Wyoming. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Est. Value Notes: Engineer's estimate = 1.2 million Est. Completion Date: Oct. 31, 2024 Site Directions: From I-25, take exit 140 onto W. Yellowstone Hwy. Continue past the first light and keep traveling on Yellowstone Hwy for approximately 1.25 miles. Turn left into the project vicinity. The project is bound by the railroad tracks and 4th Street and Center St to Elm Street. The Project generally consists of replacing the aging sewer mains in the 2.5, and 3.5 Alleys between Center Street and Elm Street. In total the project includes approximately 1690 L.F of 8-inch SDR35 PVC sewer pipe, 320 L.F of DR25 water class sewer pipe, and approximately 315 L.F. of SDR26 fusible PVC installed via pipe bursting, new manholes, and sewer services. This project also includes the replacement of approximately 215 L.F. 6-inch C900 PVC water main with water services and fire line connections. Finally, this project includes the full depth reconstruction of both alleys with asphalt pavement and the installation of a concrete valley gutter at the center of each alley.

Award

Sidewalks / Parking Lot

$1,430,125.00

Public - City

Paving, Site Work

21

9

5

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
15
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

July 30, 2024

Project location map

Multiple Locations, Douglas, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.