EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Quispamsis, New Brunswick. Completed plans call for site work for a water / sewer project.

Work of this Contract generally includes, but is not necessarily limited to, the supply of labour, transport, materials, services, equipment and incidentals necessary to complete the culvert repair on Robinhood Lane. Also included is all work of a general nature such as co-ordination, obtaining permits and approvals, clean-up, property protection and testing. In general, without limiting the scope of the Work, the Contract consists of drainage improvements at the following locations: Robinhood Lane, Quispamsis, NB. The Town has acquired a WAWA permit for the project. .1 Supply and install 4 type C erosion control structures. .2 Clear and Grub 300m2 of trees .3 Supply and Install 28.8m of new 750mm Concrete Pipe .4 Supply and Install 8 tension rod assembly for raised bell .5 Supply and Install 600tons of R-25 rock. .6 Supply and Install 100m2 of geotextile fabric. .7 Supply and Install 1500tons of Pit Run. .8 Supply and Install 30m3 of topsoil. .9 Supply and Install 175m2 of FRM Hydro seed. .10 Remove type C erosion control structures once vegetation has been established. .11 Supply and Install 2 Inlet Grates award is subjec to final approval

Award

Water / Sewer

$106,585.00

Public - City

Site Work

4

16

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
16
Bidding Soon
232
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

June 30, 2023

img_map_placeholder

Robin Hood Ln, Quispamsis, NB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.