Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Moulton, Alabama. Completed plans call for site work for a water / sewer project.
City of Moulton Sewer Improvements: The project consists of replacing a 4" sanitary sewer line withapproximately 1,950 LF of 6" forcemain and 725 LF of 8" gravity sewer. The project is funded by the Appalachian Regional Commission Compliance with all applicable Federal, State, and local laws, rules, and regulations is required. A certificate of compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act and the State of Alabama Disclosure Statement is required by all contractors. Performance and Labor and Material Payment Bonds, proof of insurance, and a complete list ofsubcontractors and suppliers will be required prior to the signing of the Contract. A Performance Bond in an amount equal to one hundred percent (100%) of thecontract costs and a Labor and Material Payment Bond in an amount of one hundred percent (100%) of the contract cost in the form and terms approved by the will be required at the signing of the contract. No bids will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified to submit a bid for this construction in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license from the State Licensing Board for General Contractors, Montgomery, Alabama, as required by Chapter 8 of Title 34, of the Code of Alabama, 1975. In addition, non-residents of the State, if a corporation, shall show evidence of having qualified with the Secretary of State to do business inthe State of Alabama. The bidder shall show evidence by clearly displaying the current license number on the outside of the sealed envelope in which the bid is delivered. In addition, bids shall be clearly identified on the exterior of the package with the bidder's name, address, thename of the project being bid,and time and place of the bid opening. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The Owner reserves the right to rejectany or all bids and to waive technical errors if the best interest of the Owner will thereby be promoted. All bids received after the date and time of the bid opening noted above will be returned unopened. The right is reserved to reject any and/or all bids and waive informalities and furnish any item of material or work to change the amount of said Contract.
Post-Bid
Water / Sewer
$1,665,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2024
May 13, 2024
Multiple Locations, Moulton, AL
Related To This Project
Moulton, AL
Bid Date: Jun 29 2023
Moulton, AL
Bid Date: Jun 29 2023
Moulton, AL
Bid Date: Jul 11 2023
Moulton, AL
Bid Date: Jul 18 2023
Moulton, AL
Bid Date: Sep 06 2023
Moulton, AL
Bid Date: Sep 06 2023
Moulton, AL
Bid Date: Aug 15 2023
Moulton, AL
Bid Date: Jan 26 2024
Moulton, AL
Bid Date: Jun 06 2023
Moulton, AL
Bid Date: Jun 15 2023
Moulton, AL
Bid Date: Jun 12 2023
Moulton, AL
Bid Date: May 16 2023
Moulton, AL
Bid Date: May 16 2023
Moulton, AL
Bid Date: Jun 08 2023
Moulton, AL
Bid Date: Feb 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.