BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in El Paso, Texas. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 8/10/2023, owner has determined a shortlist of Design Builders. Question Deadline 06/14/2023 at 5:00 PM MT Answers To Questions: 6/21/2023 The City reserves the right, at its sole discretion, to adjust this Schedule of Events as it deems necessary. If necessary, the City will communicate adjustments to any event in the Schedule of Events in the form of an amendment. Evaluation: July 2023 Contract Award Date (approx.):September 2023 Contact: Claudia A. Garcia Address: Purchasing & Strategic Sourcing City 1 1st Floor 300 N Campbell St. El Paso, TX 79901 Phone: (915) 212-1218 Fax: (915) 212-0044 Email: GarciaCA2@elpasotexas.gov The project generally consists of the design and construction of approximately 1.1 miles of roadway including but not limited to drainage, ponding areas, utilities, landscaping, irrigation, illumination, signing and striping improvements. The scope of services and work will include an in-depth site assessment, complete design, engineering, utility coordination, permitting and construction necessary for the successful development of the Project. The estimated project budget is $12M. o George Perry Boulevard Extension starting from Walter Jones Boulevard and going northeast towards Constitution Avenue. The project scope of work involves the construction of approximately 1.1 miles of roadway including new paved surface, curb and gutters, parkway improvements, reinforced concrete driveways, ADA wheelchair ramps and sidewalks. Additionally, the project will incorporate intersection/safety improvements inclusive of traffic signals, roundabouts, signing, pavement markings, and street lighting along the new corridors. The project will also include utility infrastructure/improvements related to drainage, domestic water and sanitary sewer. Existing ponding areas located south of Spur 601 will be re-graded to accommodate future development. New drainage inlets are anticipated throughout the new roadway surface to ensure it meets the required drainage criteria and ensure the runoff generated within the project limits is captured. Potable water line and sanitary sewer line improvements, consisting of manholes, valves, fire hydrants, fittings and all associated appurtenances for the systems, will be incorporated for the future commercial and industrial development within the project envelope. The project will add irrigation and landscape improvements consisting of trees, shrubs, and groundcovers native from the region. Lastly, it is anticipated that an art piece be provided on the proposed roundabout intersection of the Geroge Perry Boulevard and Constitution Avenue extensions. The characteristics of this project will require a high degree of cooperation and coordination between the El Paso International Airport (EPIA) and the Design-Build Team. The Project is comprised of the design and construction of the George Perry Boulevard Extension, Constitution Avenue Extension. The Design-Build Team shall perform all services and work necessary to complete and deliver a Turn-Key Project in accordance with the terms of the Design Criteria Package and Design-Build Agreement, and shall complete the design services to include deliverables of construction documents and specifications as well as Construction Administration services by the Design-Build Team's Design Professional of Record. There will be only one (1) Design-Build Agreement . Generally, the Design-Build Team's scope of services and work will include the planning, development, design, engineering, and construction of the roadways, utility relocations, pedestrian improvements and related improvements for the Project, including but not limited to all architect, engineering, construction, and other services necessary for the successful development, execution and completion of the Project. The scope of services and work generally described herein will also be defined in detail in the DB Agreement

Final Planning

Roads / Highways

$12,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
7
Bidding Soon
248
All Active Projects
99
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.