Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in El Paso, Texas. Working plans call for site work for a road / highway; and for paving for a road / highway.
As of 8/10/2023, owner has determined a shortlist of Design Builders. Question Deadline 06/14/2023 at 5:00 PM MT Answers To Questions: 6/21/2023 The City reserves the right, at its sole discretion, to adjust this Schedule of Events as it deems necessary. If necessary, the City will communicate adjustments to any event in the Schedule of Events in the form of an amendment. Evaluation: July 2023 Contract Award Date (approx.):September 2023 Contact: Claudia A. Garcia Address: Purchasing & Strategic Sourcing City 1 1st Floor 300 N Campbell St. El Paso, TX 79901 Phone: (915) 212-1218 Fax: (915) 212-0044 Email: GarciaCA2@elpasotexas.gov The project generally consists of the design and construction of approximately 1.1 miles of roadway including but not limited to drainage, ponding areas, utilities, landscaping, irrigation, illumination, signing and striping improvements. The scope of services and work will include an in-depth site assessment, complete design, engineering, utility coordination, permitting and construction necessary for the successful development of the Project. The estimated project budget is $12M. o George Perry Boulevard Extension starting from Walter Jones Boulevard and going northeast towards Constitution Avenue. The project scope of work involves the construction of approximately 1.1 miles of roadway including new paved surface, curb and gutters, parkway improvements, reinforced concrete driveways, ADA wheelchair ramps and sidewalks. Additionally, the project will incorporate intersection/safety improvements inclusive of traffic signals, roundabouts, signing, pavement markings, and street lighting along the new corridors. The project will also include utility infrastructure/improvements related to drainage, domestic water and sanitary sewer. Existing ponding areas located south of Spur 601 will be re-graded to accommodate future development. New drainage inlets are anticipated throughout the new roadway surface to ensure it meets the required drainage criteria and ensure the runoff generated within the project limits is captured. Potable water line and sanitary sewer line improvements, consisting of manholes, valves, fire hydrants, fittings and all associated appurtenances for the systems, will be incorporated for the future commercial and industrial development within the project envelope. The project will add irrigation and landscape improvements consisting of trees, shrubs, and groundcovers native from the region. Lastly, it is anticipated that an art piece be provided on the proposed roundabout intersection of the Geroge Perry Boulevard and Constitution Avenue extensions. The characteristics of this project will require a high degree of cooperation and coordination between the El Paso International Airport (EPIA) and the Design-Build Team. The Project is comprised of the design and construction of the George Perry Boulevard Extension, Constitution Avenue Extension. The Design-Build Team shall perform all services and work necessary to complete and deliver a Turn-Key Project in accordance with the terms of the Design Criteria Package and Design-Build Agreement, and shall complete the design services to include deliverables of construction documents and specifications as well as Construction Administration services by the Design-Build Team's Design Professional of Record. There will be only one (1) Design-Build Agreement . Generally, the Design-Build Team's scope of services and work will include the planning, development, design, engineering, and construction of the roadways, utility relocations, pedestrian improvements and related improvements for the Project, including but not limited to all architect, engineering, construction, and other services necessary for the successful development, execution and completion of the Project. The scope of services and work generally described herein will also be defined in detail in the DB Agreement
Final Planning
Roads / Highways
$12,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2023
February 9, 2024
George Perry Blvd, El Paso, TX
Related To This Project
El Paso, TX
Bid Date: Jul 13 2023
El Paso, TX
Bid Date: Jun 30 2023
El Paso, TX
Bid Date: Jul 12 2023
El Paso, TX
--
El Paso, TX
Bid Date: Mar 29 2024
El Paso, TX
--
El Paso, TX
--
El Paso, TX
Bid Date: Oct 20 2021
El Paso, TX
Bid Date: Dec 13 2023
El Paso, TX
--
El Paso, TX
--
El Paso, TX
Bid Date: Jun 29 2023
El Paso, TX
--
El Paso, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.