Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Palos Heights, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Removal of the existing double-barreled 96" CMP culvert and replacement of the same size doublebarreled 96" RCP culvert within the Navajo Creek on 123rd Street at the indicated locations on the construction plans. Work also includes the construction of sidewalks, handrails, and concrete pavement. The proposed construction shall also include construction activities within the stream; therefore, creek diversion, dewatering, erosion, and sediment control measures will be required during the construction period.

Award

Bridges / Tunnels

$422,550.00

Public - City

Paving, Site Work

13

5

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
574
Active Projects
250
Bidding Soon
3,816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

Project location map

W 123rd St, Palos Heights, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed