BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

This project is located in Region 1 in Arapahoe County. Project work consists of bottleneck mitigation at the interchange if SH83 And SH88 primarily consisting of modifications to the eastbound outside curb line, and changes to the signing and striping. Work will also include minor signal modifications. Please contact Tony Brindisi at 303-512-4331 for all project related questions. Region: 1 Counties: Arapahoe It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 Contract UDBE Goal: 0.00 % Work Days: 40 CODOT - 002 - Region 1 - Bottleneck Mitigation at SH83 and SH88 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,094,668.00

Public - State/Provincial

Paving, Site Work

222

5

5

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
79
Bidding Soon
1,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

November 27, 2023

Project location map

CO-83, Aurora, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.