BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work for a playground / park / athletic field in Kansas City, Missouri. Completed plans call for site work for a playground / park / athletic field.

Kansas City has updated project: North Terrace Lake Improvements City desires that Minority Business Enterprises (MBE) and Women's Business Enterprises (WBE) have a maximum opportunity to participate in the performance of City contracts. The goals for this specific Project are (15%) MBE participation and (15%) WBE participation. This work shall consist of the application of a thin, uniform layer of emulsified asphalt to the existing pavement surface in order to universally seal cracks from the intrusion of surface water. Cover aggregate shall then be uniformly distributed upon the asphalt layer and seated in place with the use of a rubber-tired roller. Any excess aggregate material shall be removed, leaving a durable wearing surface. This work shall consist of the application of a thin, uniform layer of liquefied asphalt to the surface of the existing roadway which may either consist of an existing surface of asphaltic concrete or a gravel-surfaced road. Cover aggregate shall then be distributed uniformly upon the liquefied asphalt and seated in place with the use of a rubber-tired roller leaving a durable wearing surface.. This work shall consist of the application of Slurry Seal Material to an existing surface. The Slurry Seal shall consist of a mixture of emulsified asphalt, mineral aggregate and potable water, properly proportioned, mixed and spread on the surface in accordance with this specification and as directed by the Engineer This work shall consist of the application of a polymer modified asphalt emulsion, mineral aggregate, mineral filler, potable water, and other additives, properly proportioned, mixed and spread on a paved surface in accordance with this specification and as directed by the Engineer. A. Storm sewer construction shall consist of furnishing all labor, materials, and equipment necessary for the complete installation of storm sewers and appurtenances in accordance with the Standard Drawings, Contract Drawings, General and/or Supplemental Conditions, specifications and standards referenced herein, and these specifications. Unless otherwise noted within these specifications, the word "sewers" shall refer to pipe sewers, box culvert sewers, or open channels.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,055,110.00

Public - City

Site Work

29

30

27

3

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
61
Bidding Soon
1,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 3, 2025

Project location map

2700 Cliff Dr, Kansas City, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.