Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a medical facility in San Antonio, Texas. Completed plans call for the construction of a 102,000-square-foot, six-story above grade medical facility.
The Project is a Medical Office Building ~102,000 sf total. 5 levels plus penthouse. The primary spaces within the facility include community engagements spaces, clinical spaces for neurology, the Biggs Institute and neuropsychology, an imaging CT & 7T MRI suite, lab, pharmacy, physical therapy suite and office and administration spaces. The budget for this project is $75,000,000 Package 2 - (this bid package) will consist of but is not limited to: scaffolding, cranes and hoists, demolition, structural concrete, masonry, steel, decorative metal rails, casework, woodwork, insulation, waterproofing, fireproofing, firestopping, formed & composite metal wall panels, roofing, doors frames Hardware, curtain wall, glazing, auto entrances, smoke containment, louvers, plaster, drywall, ceilings, flooring, wall protection, canopies, Div 10 specialties, Lab casework and equipment, radiation protection, MRI shielding, elevators, fire sprinklers, plumbing, HVAC, electrical, lighting protection, structured cabling, access controls, video surveillance, emergency radio repeaters, fire alarm, landscape, irrigation, site paving, retaining walls, unit pavers, The finish out of Level 5 is alternates that would be accepted at the time of NTP and would not require remobilization. As of August 14, 2023, a general contractor has been selected. Additional subcontract trade packages were bid out in June. Construction started January 2023.
Award
Medical
$75,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2023
July 24, 2023
Floyd Curl Dr & Charles Katz Dr, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Jul 24 2023
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jun 21 2023
San Antonio, TX
Bid Date: Jun 22 2021
San Antonio, TX
Bid Date: May 11 2021
San Antonio, TX
Bid Date: Aug 31 2023
San Antonio, TX
Bid Date: Jun 13 2023
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.