BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 1, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Indianapolis, Indiana. Design plans call civil work for a bridge / tunnel and road / highway.

As of June 1, 2023, the plans for the West Side Infrastructure Project design are approximately 90% complete. An engineer has been selected. The target date for substantial completion of the West Side Infrastructure Project is December 31, 2024. A detailed scope has not been released. The “West Side Infrastructure Project” which includes all Infrastructure to be constructed as part of the project on the west side of the White River within and adjacent to the District, including the western approach to the bridge.

Design

Roads / Highways

$20,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
63
Bidding Soon
1,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2023

Project location map

Multiple Locations, Indianapolis, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.