BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting, new construction, renovation and addition to a civil project in Syracuse, New York. Conceptual plans call for the addition of a bridge / tunnel; for the construction of a bridge / tunnel; for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; for outdoor lighting for a road / highway; road / highway; and road / highway.

This project includes construction of 3.0 miles of an accessible pedestrian and bicycle trail from W. Colvin St. to Dorwin Ave. following Onondaga Creek. The trail will connect at W. Colvin Street to the Creekwalk Phase II trail completed in 2020. The trail will provide and extend an alternative transit route from the south city line to downtown and Onondaga Lake. The trail will serve the South Side and Valley neighborhoods, as well as the city and surrounding areas. The project will replace two pedestrian bridges. Trail amenities will include lighting, rest areas, bike and electric vehicle infrastructure, and chair charging stations. As of September 29, 2023, this project is included in the City of Syracuse FY 2024-2028 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to a future fiscal year. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$12,756,000.00

Public - City

Addition, New Construction, Outdoor Lighting, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
70
Bidding Soon
894
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2028

img_map_placeholder

W Colvin St, Syracuse, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.