Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 23, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Anderson, South Carolina. Completed plans call for site work for a water / sewer project.
COMPLETION DATE: After Notice to Proceed, 570 calendar days to delivery. SCOPE OF WORK A. All concrete structures designed to hold water shall be constructed of Class A reinforced concrete, and all structures shall be made completely watertight. The General Specifications for Reinforced Concrete included herein set forth the requirements for mix design details of constructing reinforcement, etc. B. All surfaces of concrete structures that will be exposed after backfilling shall be formed with prefabricated plywood or metal forms. All exposed surfaces shall be rubbed with a carbide stone until all form marks have been removed and all exposed surfaces shall be formed true to within a plus or minus 1/8 tolerance.
Award
Water / Sewer
$9,071,058.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
