BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Sun Prairie, Wisconsin. Completed plans call for site work for a playground / park / athletic field; and for the construction of a 3,900-square-foot, one-story above grade playground / park / athletic field.

From the information provided by the client, it is understood that the proposed development will consist of a new restroom building, pavilion, concrete pavement, asphalt trail, and utilities. The pavilion and restroom are estimated to be supported by frost depth spread footings. Proposed pavements will be flexible asphalt and rigid concrete. Primarily, pavements will be used for pedestrian traffic and will be used for occasional maintenance truck traffic. Traffic loading details were not provided. Proposed utilities include a new gravity 8-inch diameter sanitary sewer and a new 8 or 12-inch diameter watermain. Utility bearing depths were not provided but are estimated to be less than 15 feet below existing grades. Structural loads were not provided but are estimated to be light to moderate in magnitude. It is understood that the finished floor elevation of the new restroom will be about EL 947 and the finished floor of the new pavilion will be about EL 940. The invert elevations of utilities were not provided by the client. Elevations at the borings located within the proposed pavilion and restroom ranged from about EL.941 to EL. 947. Based upon elevations in the area of the proposed pavilion (EL. 941) and restroom (EL. 947), cuts of about 2 feet and fills of about 2 feet are estimated to be required to establish the floor slab elevation, respectively. However, this will also be dependent on the subgrade preparation criteria, to be discussed in a later section of this report Questions received less than ten days prior to the date for opening of Bids may not be answered.

Bid Results

Playgrounds / Parks / Athletic Fields

$549,674.00

Public - City

New Construction, Site Work

17

21

22

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
64
Bidding Soon
1,106
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2024

February 26, 2024

img_map_placeholder

1221 O'Keeffe Ave, Sun Prairie, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.