BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a transportation facility in Montgomery, Alabama. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. Please also fill out the order form if it is in the ITB and email that form to the GMC contact. Price Range $1,500,000 - $2,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project involves the construction of a prefabricated metal electrical vault building with pre-installed airfield electrical equipment and control systems for the airfield lighting at Montgomery Regional Airport. Associated work will include site preparation, minor fencing, and foundations for the electrical vault as well as conduit and single manhole for the connections to the airfield lighting system. A Pre-Bid Meeting is scheduled for Tuesday, June 20, 2023 at 10:00 AM. at the Montgomery Regional Airport Terminal Rotunda Room located at 4445 Selma Highway Montgomery, Alabama 36108 Information for the Project can be found on the following website Copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon payment of a one-time administrative fee of $20 for digital access/file sharing access and/or payment of $50 for each printed set. Said cost represents the cost of printing, reproduction, handling, and distribution, therefore no refund will be granted. Checks for Bidding Documents shall be payable to "Goodwyn Mills Cawood, LLC." Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence oflicense before bidding or bid will not be received or considered by the Engineer;the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered."A contractor must have a Heavy and Railroad major license or a Heavy and Railroad specialty license to bid as prime for this project." Bids may be held by the Montgomery Airport Authority for a period not to exceed ninety (90) days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. Award of contract is subject to requirements in the contract documents including, but not limited to, the following Federal provisions: 1) Buy American Preference 2) Civil Rights - Title VI Assurances 3) Equal Employment Opportunity 4) Davis Bacon 5) Debarment and Suspension 6) Disadvantaged Business Enterprise 7) Foreign Trade Restriction 8) Lobbying Federal Employees 9) Recovered Materials A Disadvantaged Business Enterprise (DBE) Goal of 9.79% has been established for this project. The Montgomery Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. The Montgomery Airport Authority reserves the right to reject any and all bids and to waive any informality or irregularity in the bids received. Wade Davis, Executive Director Montgomery Airport Authority 4445 Selma Highway Montgomery, AL 36108 AIP PROJECT NO.: 3-01-0053-060-2023 Time of Performance: By submittal of this proposal, the undersigned agrees to complete the Project within 60 Calendar Days.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - City

Renovation, Site Work

35

15

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
20
Bidding Soon
421
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

August 28, 2023

img_map_placeholder

4445 Selma Hwy, Montgomery, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.