BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in San Diego, California. Working plans call for the renovation of a municipal facility.

**As of August 3, 2023. The owner has determined a prequalified list of general contractors Project scope may include; replacement of relay controller with new microprocessor control system with solid-state starter and battery lowering device; replacement of submersible pump units with new submersible power unit assemblies; install seismic rupture valve; replacement of door operator and associated hoistway door equipment with new high speed solid state micro-processor closed loop door operator; replacement of hoistway and machine room wiring with all new code complying wiring; replacement of signals and operating fixtures with new fixtures (ADA); installation of new underground cylinder with PVC casing; and replacement of lighting in machine room and elevators cars. The project scope may also include repairs and replacement of existing geared machines and DC motors with new AC gearless machines; existing deflector sheaves with new, mounted in machine room if possible; existing PC Board Logic Controllers with new non-proprietary solid state micro-processor control systems; existing SCR drives with new VVVF AC regenerative motor drive units; existing hoistway and machine room wiring with all new code complying wiring; existing governors with new; existing car traveling buffers with new pit mounted buffers; exiting car and counterweight roller guides with new; existing ceilings with new downlight ceilings with energy efficient LED lights; add emergency battery power rescue unit; existing signals and operating fixtures with new fixtures; and removal of heat sensors. Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to bid on this specific project. No Prequalification Questionnaire will be received after 4:00 P.M., Tuesday, June 27, 2023. Estimated Project Duration: 365 calendar days

Final Planning

Municipal

$720,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
41
Bidding Soon
1,055
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

February 27, 2024

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.