BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Hopewell, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of December 4, 2023, notice to proceed has been issued, construction is underway and expected to be completed in April, 2025. The work involves upgrades and additions to the Hopewell wastewater treatment facility including influent pump station, packaged extended aeration wastewater treatment plant process, solids holding tanks/aerobic digesters, ultraviolet disinfection system and post aeration facilities, chemical feed and storage systems, electrical room addition, earthwork, mechanical piping and equipment, yard piping, instrumentation control and monitoring system, HVAC work, plumbing work, electrical work, building architectural work, structural steel and reinforced concrete construction, site improvements and all required appurtenances. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended as well as American Iron and Steel Requirements as amended, Build America, Buy America Requirements and Infrastructure Investment and Jobs Act. The Act and amendments require that the Contractor use or furnish only steel products {as defined in the Act and amendments) which have been produced in the United States. A certified check or bank draft, payable to the order of the Bedford County Board of Commissioners, or negotiable U.S. Government bonds {at par value), or a satisfactory Bid Bond executed by the Bidder and a surety named in the current list of acceptable sureties published in U.S. Treasury Department Circular 570 {amended), in the amount equal to ten percent {10%) of the total Bid shall be submitted with each Bid CDBG-21C-82953 MBEGoal: 5.0% WBE Goal: 3.0% The Successful Bidder will be required to execute the Agreement and to furnish Performance and Payment bonds, each of said bonds to be in the amount of one hundred percent ( 100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. l questions about the meaning or intent of the Bidding Documents are to be directed to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda, mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents.

Under Construction

Water / Sewer

$329,250.00

Public - County

Site Work

52

27

22

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
31
Bidding Soon
788
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

December 4, 2023

img_map_placeholder

411 Broad St, Hopewell, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.