Published July 19, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Ravenna, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The proposed work under this contract consists of the replacement of approximately 1,600 lineal feet of 8" water line with new valves, hydrants and services; new curbs, driveway aprons and sidewalk replacement. Each bid must be accompanied by a "Bid Guarantee" in either of the following two forms: Option "A" - a bid bond in the full amount of the bid or Option "B" - a certified check or cashier's check in the sum of 10 percent of the amount of the bid. Bid security furnished in bond form shall be issued by a surety company or corporation licensed in the State of Ohio to provide said surety. The Bid Guarantee is conditioned to provide that if the Bid is accepted and awarded the Bidder will enter into a contract with the County and will file a Performance Bond as required. The Bidder to whom the Contract is awarded will be required to furnish a Performance Bond in the sum of 100 percent of the contract price for the faithful performance of the Contract. If the Bidder selects "Bid Guarantee" Option "A", the Bidder may use this Bond as the Performance Bond. Each bid must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each Bidder must submit evidence of his experience on projects of similar size and complexity. The Portage County Board of Commissioners reserves the right to waive any informality or to reject any and all bids or portions thereof. No bidder may withdraw his bid within thirty days (30) after the actual date of the opening thereof. The contractor shall be aware that this project is funded with a grant using federal funds and all HUD requirements must be met. Bids will be evaluated at a minimum on experience on similar projects, cost, and ability to complete the project before August 31, 2023. Any technical questions should be in writing to David Bakalar, P.E., Thomas Fok & Associates, Inc. at dbakalar@fokeng.com or any General questions to Lisa Reeves, CDBG Specialist, P.C. Regional Planning Commission via email at lreeves@pcrpc.org The contractor shall provide proof of Workers' Compensation and Liability Insurance with the bid. The successful bidder must comply with Equal Employment requirements as specified in Executive Order 11246 and 11375.

Award

Sidewalks / Parking Lot

$439,465.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
89
Bidding Soon
1,354
All Active Projects
552
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

July 14, 2023

img_map_placeholder

Multiple Locations, Ravenna, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Maple Grove Waterline & Sidewalk Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.