Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in West Haven, Connecticut. Contact the soliciting agency for additional information.
Units are currently being brought online to test for functionality. Service reports are available from Joel C./Plant Supervisor. Service work is being provided by Broad this week (week of June 5th) to setup the building 19/ CHP Plant s chilled water system for the cooling season. Per work on Tuesday, June 6, 2023, basket strainers were found to be plugged and have been cleaned. Building 19 chilled water system (chillers, cooling towers) will be exercised before end of week to assess and improve flow and improve operational efficiency as required. Board has provided past pre and post cooling season services for the building 19/ CHP Plant in August 2021, Oct 2022, April 2022, and July 2022. What process (if any) was used to put the absorbers into long term storage Long term storage was performed by Broad USA the manufacture of absorber. What documentation was done with putting the absorbers into long term storage and does the VA (or a Contractor) have this documentation See answers to question #1. Is there any documentation on the condition of the bromide and/or has the bromide been tested in the past or recently BRASCO In August of 2022 conducted a checks and test of the Cooling Tower and Bromide for quality and/or biological record on file in CHP Plant. Have the chiller tubes been punched or have Eddy Currents been performed The chiller tubes have not been punched. Board checked but did not punch. Per the check this week, flow through absorption cooling unit deemed to be OK. Full system operation/flow is scheduled before end of this week. See answer to question #1. Is there currently water in the chiller barrels It will be filled by end of the week of June 5th. If so, has that water been tested in the past or recently N/A Are there original start-up sheets available for the absorbers Yes (on the HDMI). Board s O&M Manual(s) available on site and/or through vendor. Does the warranty being asked for in the bid document refer to labor, equipment or bot. Equipment Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is June 5, 2023 at 6:00 PM EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers. Vendors shall acknowledge all amendments within the solicitation response. Site Visit and Questions: A site visit is planned for Monday June 5, 2023 at 10:00 AM EST. Please contact Gary Barbour to coordinate attendance. Mr. Barbour can be contacted at gary.barbour@va.gov. No questions will be answered at the site visit. Please note the speculated period of performance start date is: 23-June-2023, these dates are subject to change depending on the award date.
Post-Bid
Medical
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2023
June 23, 2023
950 Campbell Ave, West Haven, CT
Related To This Project
West Haven, CT
Bid Date: Jul 06 2023
West Haven, CT
Bid Date: Aug 08 2023
West Haven, CT
Bid Date: Feb 08 2022
West Haven, CT
Bid Date: Jul 24 2023
West Haven, CT
Bid Date: Jul 31 2023
West Haven, CT
Bid Date: Aug 24 2023
West Haven, CT
Bid Date: Jan 16 2024
West Haven, CT
Bid Date: May 30 2023
West Haven, CT
--
West Haven, CT
Bid Date: May 23 2023
West Haven, CT
Bid Date: May 19 2023
West Haven, CT
Bid Date: Jun 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?