BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in West Haven, Connecticut. Contact the soliciting agency for additional information.

Units are currently being brought online to test for functionality. Service reports are available from Joel C./Plant Supervisor. Service work is being provided by Broad this week (week of June 5th) to setup the building 19/ CHP Plant s chilled water system for the cooling season. Per work on Tuesday, June 6, 2023, basket strainers were found to be plugged and have been cleaned. Building 19 chilled water system (chillers, cooling towers) will be exercised before end of week to assess and improve flow and improve operational efficiency as required. Board has provided past pre and post cooling season services for the building 19/ CHP Plant in August 2021, Oct 2022, April 2022, and July 2022. What process (if any) was used to put the absorbers into long term storage Long term storage was performed by Broad USA the manufacture of absorber. What documentation was done with putting the absorbers into long term storage and does the VA (or a Contractor) have this documentation See answers to question #1. Is there any documentation on the condition of the bromide and/or has the bromide been tested in the past or recently BRASCO In August of 2022 conducted a checks and test of the Cooling Tower and Bromide for quality and/or biological record on file in CHP Plant. Have the chiller tubes been punched or have Eddy Currents been performed The chiller tubes have not been punched. Board checked but did not punch. Per the check this week, flow through absorption cooling unit deemed to be OK. Full system operation/flow is scheduled before end of this week. See answer to question #1. Is there currently water in the chiller barrels It will be filled by end of the week of June 5th. If so, has that water been tested in the past or recently N/A Are there original start-up sheets available for the absorbers Yes (on the HDMI). Board s O&M Manual(s) available on site and/or through vendor. Does the warranty being asked for in the bid document refer to labor, equipment or bot. Equipment Questions shall be submitted to the Contracting Officer in writing via e-mail. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions is June 5, 2023 at 6:00 PM EST. Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers. Vendors shall acknowledge all amendments within the solicitation response. Site Visit and Questions: A site visit is planned for Monday June 5, 2023 at 10:00 AM EST. Please contact Gary Barbour to coordinate attendance. Mr. Barbour can be contacted at gary.barbour@va.gov. No questions will be answered at the site visit. Please note the speculated period of performance start date is: 23-June-2023, these dates are subject to change depending on the award date.

Post-Bid

Medical

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
193
Bidding Soon
4,279
All Active Projects
1,818
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

June 23, 2023

img_map_placeholder

950 Campbell Ave, West Haven, CT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.