Demolition, site work, new construction and addition to a water / sewer project in Chesapeake, Virginia. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
The Work under this project consists of: 1. Demolition of the two existing southern spent cleaning solution tanks and associated support pad and portions of the existing spent cleaning solution containment walls and the tank base slab to permit installation of a new drainpipe and electrical conduits from the new UV Disinfection Building to the existing Membrane/Chemical Building basement. 2. Construction of new concrete walls to enclose the containment area serving the two remaining north spent cleaning solution tanks. 3. Installation of a new UV Disinfection Building including restoration of the existing base slab and a new foundation wall followed by installation of the new prefabricated UV Disinfection Building. 4. Installation of two new UV disinfection reactors and associated stainless steel piping, false floor grating system, HVAC equipment and lighting within the new UV Disinfection Building. 5. Installation of new electrical power/control panels for the new UV reactors in the Membrane/Chemical Building existing electrical room and additional UV control panels in the new UV Disinfection Building. 6. Installation of new elevated outdoor UV influent and effluent piping and associated pipe supports between the new UV Disinfection Building and the modified existing Finished Water Chemical Addition Structure. Prior to starting the modifications described above, reroute the existing water quality sample and drain lines to a Contractor furnished portable enclosure and connect to the new instruments installed in the enclosure and connected to the existing plant control system. 7. Once the new portable enclosure and water quality instruments are operational and approval is given by the City, modifications requiring a plant shutdown can begin within the Finished Water Chemical Addition structure. 8. Following completion of the plant shutdown, the new water quality instruments and associated sample lines shall be relocated to their permanent location within the Finished Water Chemical Addition Structure (one instrument at a time within 1 hour each) and the temporary enclosure shall be removed from the site. 9. Startup and testing of the new UV reactors shall be completed once finished water can be passed through them. The Work under this project consists of: 1. Demolition of the two existing southern spent cleaning solution tanks and associated support pad and portions of the existing spent cleaning solution containment walls and the tank base slab to permit installation of a new drain pipe and electrical conduits from the new UV Disinfection Building to the existing Membrane/Chemical Building basement. 2. Construction of new concrete walls to enclose the containment area serving the two remaining north spent cleaning solution tanks. 3. Installation of a new UV Disinfection Building including restoration of the existing base slab and a new foundation wall followed by installation of the new prefabricated UV Disinfection Building. 4. Installation of two new UV disinfection reactors and associated stainless steel piping, false floor grating system, HVAC equipment and lighting within the new UV Disinfection Building. 5. Installation of new electrical power/control panels for the new UV reactors in the Membrane/Chemical Building existing electrical room and additional UV control panels in the new UV Disinfection Building
Bid Results
Water / Sewer
$4,027,000.00
Public - City
Addition, Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
July 24, 2023
September 21, 2023
To Be Determined, Chesapeake, VA
Related To This Project
Chesapeake, VA
Bid Date: Jun 28 2023
Chesapeake, VA
Bid Date: May 30 2019
Chesapeake, VA
Bid Date: Jul 25 2023
Chesapeake, VA
Bid Date: Aug 04 2023
Chesapeake, VA
Bid Date: Jul 25 2023
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
Bid Date: May 24 2024
Chesapeake, VA
Bid Date: Jul 11 2023
Chesapeake, VA
Bid Date: May 31 2023
Chesapeake, VA
Bid Date: Jun 22 2023
Chesapeake, VA
Bid Date: Jun 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--