Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 21, 2026

Site work and paving for a bridge / tunnel in Brownfield, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge replacement projects BF 08802, Carrying Hwy 872:02 Over Sounding Creek (Construction WAC0086935); BF 75735, Carrying Hwy 36:12 Over Tributary to Sullivan Lake (Construction WAC0090356); and TIMELINE: BF77435 has been tendered and awarded in a separate report. The remaining structures are not currently included in the 3-year construction program. Further schedules may be confirmed spring 2027.

Design

Bridges / Tunnels

$6,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
62
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2027

Project location map

AB-872, Brownfield, AB


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed