Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 28, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Boston, Massachusetts. Completed plans call for the renovation of a educational facility.

Irving Schoolyard Swing Space Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Estimated Cost $3,493,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Sub Bid Deadline 6/22/23 Time 12:00 P.M. Sub Bid Category Electrical Work Fire Protection Sprinkler Systems HVAC Painting Plumbing Resilient Floors Waterproofing, Damp-proofing, and Caulking

Post-Bid

Educational

$3,493,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
788
Active Projects
391
Bidding Soon
5,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

September 4, 2023

Project location map

105 Cummins Hwy, Boston, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed