BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a road / highway in Alton, Illinois. Completed plans call for the demolition of a road / highway; and for site work for a road / highway.

The project consists of the complete demolition and removal and disposal of any existing buildings, fences and similar appurtenances located on the premises. The foundation, footing and basement floors shall be completely removed from the demolition site and disposed of at an approved disposal site. Any cisterns or similar reservoirs found on the premise are to be removed. Any questions regarding this bid should be directed to Lori Bockholdt, Comptroller's Office, City of Alton (618) 463-3545. Copies of the Asbestos Abatement report(s) will be provided upon request. The City cannot accept your bid response via fax. A copy of the bid tabulation will be available upon written request to the Comptroller's Office or by email to lbockholdt@cityofaltonil.com. Telephone requests will not be accepted. Each written request must contain a self-addressed, stamped envelope and must reference the bid title and number. Responses must be submitted in a sealed envelope containing the original copy of the response, addressed to: Lori Bockholdt Comptroller's Office 101 East Third Street Alton, IL 62002 Each sealed envelope containing a response must be plainly marked on the outside of the envelope with the respondent's name, proper address, and BID #2023 - 24 DEMOLITION. All responses must be made on the forms provided. All blank spaces must be filled in, in ink or typewritten, and the bid forms must be fully completed and executed and signed by an authorized individual.

Award

Roads / Highways

$12,300.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
51
Bidding Soon
863
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

img_map_placeholder

245 W 19th St, Alton, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.