BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of an educational facility in Arcata, California. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; and educational facility.

The Project consists of: The project as currently envisioned has two distinct elements: Element 1: Design and renovation of Jenkins Hall to accommodate the academic functions currently located in the existing Ceramics and Sculpture Labs. The removal of these facilities is necessary to construct Element 2. Jenkins Hall is on the City of Arcata's historic landmark listing (though not registered) and is currently unoccupied. Element 2: Design and construction of the Health, Dining and Housing Building Project as described more fully below: The vision is to develop a building that coalesces an ecosystem of programs and functions that will enrich the student experience and bolster persistence goals. The hybrid building (approximately 200,000 GSF) will create a welcoming hub for student life and resources that center justice, equity, belonging, holistic sustainability, and healthy living. Major program areas include: A new student health center (approximately 35,000 GSF) that will provide medical health services, counseling and psychological services and health education. A new hub for campus dining services including a cafe/bakery, (approximately 35,000 GSF) that supports holistic wellness, dignified, diverse food access to address basic needs including a food pantry program and demo kitchen connected to student health education. A 518-bed residence hall that centers belonging and community - includes a mix of units (doubles and singles) with social amenities and services that cultivate learning communities. The project site for Element 2 is situated near the current location of the existing Ceramics and Sculpture Labs, and Parking Lots R8 and G11 (northern portion). The project boundaries are approximately: Lot G11 as the southern extent, LK Wood Boulevard as the western boundary, Rossow Street as the eastern boundary and the northern boundary is the existing Campus Apartments and the rising hillside. As noted, there are existing buildings on the site that will require demolition. LICENSE REQUIREMENTS B License Last day to submit RFP questions 22 August 2023 Last day to submit RFQ questions.

Award

Educational

$25,009,001.00

Public - State/Provincial

New Construction, Renovation, Site Work

81

28

6

5

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
35
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2023

February 5, 2024

img_map_placeholder

1 Harpst St, Arcata, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.