BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Salisbury, North Carolina. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The base bid, generally described, consists of an ADA compliant, concrete paved sidewalk and ramp behind the Nature Center at Dan Nicholas Park. In general, all items and installations are described on the project drawings. A project summary spreadsheet is also included as part of these bid documents. Project is mostly general construction work. c. Alternates shall be taken per requirements of Division 1, are listed in Division 1, Section 01030. d. Proposals shall be received from licensed General Contractors. Subcontractor work of licensed Electrical Contractors, vendors, suppliers, or other installers must be included within a General Contractor's bid. Each proposal must be accompanied by a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than 5% of the proposal. In lieu thereof, a bidder may offer a Bid Bond of 5% of the bid, executed by a surety company licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will, upon demand forthwith make payment to the Obligee upon said bond, if the bidder fails to execute the contract in accordance with the bid bond. Upon failure to forthwith make payment, the surety will pay to the Obligee an amount equal to the amount of said bond. Said deposit shall be retained by the Owner as liquidated damages in the event of failure of the successful bidder to execute the contract within ten days after the award, or to give satisfactory surety as required by law. (General Statutes of North Carolina, C0143, Article 85 - 129). Payment will be made on the basis of 90% of approved monthly estimates of work completed (until a maximum of 5% of the contract amount is reached). Final payment will be made and Final Certificates will be issued upon acceptance of the work. 8. No bid may be withdrawn after time set for receiving bids for a period of sixty (60) days. 10. Owner reserves the right to waive irregularities and to reject any or all proposals.

Post-Bid

Roads / Highways

$350,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
71
Bidding Soon
1,181
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

July 31, 2023

img_map_placeholder

6800 Bringle Ferry Rd, Salisbury, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.