Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 5, 2023 at 8:00 PM
Updated January 26, 2024
Site work, paving and renovation of a mixed-use development in Savanna, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the renovation of a multi-residential development.
Carroll County Housing Authority Carroll Apartments Housing Units 2023 Sidewalk and Patio Replacements. This project includes the construction of Portland cement concrete sidewalks, patios, a garage floor and other work at the Carroll Apartment housing units located at 2009 Wacker Road in Savanna, Illinois. Work includes the removal of 2,690 square feet of existing concrete patios, stoops and sidewalks, replacement with 3,760 square feet of concrete patio and sidewalk surfaces, 4 reinforced concrete wing walls, removal of 250 square feet of 5 foot sidewalk and replacement with earth fill, a 1,500 square foot concrete interior garage floor, two-6 inch diameter buried site storm water conveyance system with dry sump collection, surface restoration and other incidental work. The work is subject to the minimum salaries and wages set forth in the contract documents and the contractor must ensure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. Materials furnished on this project shall be of domestic origin and/or manufacture. The Carroll County Housing Authority reserves the right to withhold bid documents to unqualified bidders and to reject bids or waive technicalities in the bidding. The Housing Authority reserves the right to select the contractor based on its determination of the most advantageous proposal and its decision will be final. Bids may be held for a period not to exceed 30 days from the date of opening for the purpose of evaluation prior to awarding the contract. Interested bidders are asked to contact Greg Stauder & Co., Consulting Engineers at (815) 777-1588, or Ed Bochniak, Executive Director, (815) 273-7081 extension 201 for more information.
Award
Sidewalks / Parking Lot
$181,215.00
Public - County
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2023
July 20, 2023
2009 Wacker Rd, Savanna, IL
Related To This Project
Savanna, IL
Bid Date: Nov 10 2021
Savanna, IL
Bid Date: Jan 21 2022
Savanna, IL
Bid Date: Jan 21 2022
Savanna, IL
Bid Date: Sep 22 2023
Savanna, IL
Bid Date: Oct 13 2023
Savanna, IL
Bid Date: Jun 21 2024
Savanna, IL
Bid Date: Jun 21 2024
Savanna, IL
Bid Date: Aug 01 2024
Savanna, IL
Bid Date: Jun 16 2023
Savanna, IL
Bid Date: Jun 16 2023
Savanna, IL
Bid Date: May 16 2023
Savanna, IL
Bid Date: Apr 14 2023
Savanna, IL
Bid Date: Apr 14 2023
Savanna, IL
Bid Date: Apr 28 2023
Savanna, IL
Bid Date: Sep 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
